
Corrimal
The Brief
A government-funded co-educational comprehensive secondary day school, recently underwent a significant transformation with a rebuilt and upgraded infrastructure by a construction company. This tender was released for numerous companies and KUGA won through a competitive tender for building 100kW solar PV system using 450W Risen Solar panels
The Solution
KUGA successfully delivered the 100kW solar PV system on Block G of the school meeting both the project timelines and the specifications set by the NSW Department of Education. The system’s impressive metrics include an annual solar generation of 126.531MWh and carbon dioxide savings of 126.02 tonnes, showcasing the project team’s resilience and adaptability.